Have equipment installation manuals been followed? Local and national codes followed? Has boiler had hydrostatic test, signed off by State inspector? Wiring: Voltage matches supplied components on boiler and system provided? Electrical wiring on skid mounted units has been terminated and tested?
Get A QuoteBoiler Installation & Startup Checklist. Electrical Components Measurement Specification Aquastat Settings H= L= H=high 170-200° F/L=low 160-180° F High Limit Aquastat Settings Max. = 230° F Wall Thermostat location Do not mount on boiler
Get A Quote5 2.3 Uncrating 2.3.1 Care must be taken not to damage controls or deform the boiler sheet metal during removal of the crate. 2.3.2 If using pry bars or fork lifts, be certain to support the boiler weight by the skids or channel base. 2.4 Placement CAUTION: If the equipment is to be placed in a room with little or no ventilation, a supply of ducted filtered air
Get A Quoteinvolved in a boiler installation, it may help reduce some common problems. We hope this publication assists installers and end-users of boilers and ensures boilers are properly installed enabling the end-user to operate as safe and efficiently as possible.
Get A QuoteTRIANGLETUBE PRESTIGE SERVICE TECHNICIAN MANUAL Pdf
Get A Quote• The INSTALLER of a boiler or pressure vessel shall give written notice (this Form) to the Chief Boiler Inspector AT LEAST thirty (30) DAYS BEFORE installation. The Installer should work closely with the INSURER'S Boiler Inspector during the installation.
Get A QuoteINSTRUCTIONS - INSTALLATION PERMIT (Boiler, Pressure Vessel, Pressure Piping) NOTICE: The installing contractor, in addition to obtaining a permit, is required to contact their local inspector to perform a first inspection prior to equipment startup. The inspector may ask to see the permit during the first inspection, and
Get A QuoteBoiler Preparation, Start-Up and Shutdown
Get A QuoteCopyright © 2019.Boiler All rights reserved.